On-Demand Electrical Engineering — US & Canada | SYMATEQ
United States & Canada

On-Demand & Compliance Engineering

Robust on-demand services to support the fast-paced nature of North American development — from PE seal & sign to rapid conversions and code compliance.

On-Demand Capabilities

Fast, accurate, permit-ready

PE Seal & Sign

Facilitating professional engineering seal and sign for complete electrical sets.

PDF → CAD

Rapid, highly accurate vector conversion from legacy PDFs.

CAD → Revit

Transition flat CAD into intelligent Revit models.

PDF → Revit

Reconstruct as-builts and legacy sets directly into Revit.

Compliance Check

Navigating regional regulations

We conduct rigorous compliance checks against major codes and generate specialized energy documentation, so your final deliverables are flawless, compliant, and ready for permit review.

Energy compliance documentation including COMcheck reports and California Title 24 energy compliance.
  • NEC — National Electrical Code + local amendments
  • IECC — lighting & power provisions
  • ASHRAE 90.1 — lighting energy compliance
  • NFPA 72 — fire alarm systems
  • NFPA 70E — arc-flash & electrical safety
Every deliverable is subjected to our stringent QA & QC auditing process, ensuring the final documents are flawless and permit-ready.

Why it matters

  • Reduce permit-review rejections
  • One partner for seal, conversion & compliance
  • Audited deliverables every time
  • Faster turnaround under deadline pressure
FAQ

On-demand & compliance — common questions

Can I hire SYMATEQ to prepare the electrical drawings for my project?

Yes. This is our core business — we are a specialized electrical engineering firm that prepares electrical power, lighting and low-voltage drawings for architects, PE firms, general contractors and developers across the US and Canada. You bring the project, we produce permit-ready construction documents engineered to NEC, IECC and the locally adopted code for your jurisdiction.

How quickly can you produce permit-ready electrical drawings?

Our time-zone advantage means a typical electrical plan set or load calculation is delivered in 24–48 hours from receiving the base architectural drawings. Larger or more complex projects receive a milestone schedule aligned to your submittal deadline. We commit to that schedule and deliver on time, every time.

What do I need to provide to get started?

To start, we need: (1) the base architectural drawings (PDF, CAD or Revit), (2) the project address so we can determine the applicable code jurisdiction and edition, and (3) a brief project description covering building type, occupancy and the electrical scope needed. We handle the rest — from load calculations and equipment selections to permit-ready drawings with a complete code compliance package.

Do you work on residential projects or only commercial?

Both. We engineer residential electrical drawings (custom homes, multi-family, townhouses) and commercial projects of all sizes — from single-tenant retail and medical offices to large mixed-use and industrial facilities. Residential electrical calculations follow NEC Article 220 for single-family and multi-family; commercial projects follow the commercial load calculation methods in NEC Article 220 and ASHRAE 90.1 lighting compliance.

What is a COMcheck report and when is it required?

COMcheck is the DOE's free software tool that verifies commercial building energy code compliance under the International Energy Conservation Code (IECC) or ASHRAE 90.1. Most commercial building permit submissions in the US require a COMcheck Lighting report to demonstrate the lighting design meets the energy code — interior and exterior lighting power, plus mandatory controls. We produce the complete COMcheck Lighting report as part of our standard electrical compliance package.

Do you handle California Title 24 energy compliance?

Yes — for the electrical scope. California Title 24 Part 6 is the California Energy Code and is more stringent than IECC in many respects. We produce the Title 24 lighting compliance documentation — indoor and outdoor lighting power allowances, mandatory controls, occupancy sensors and daylighting requirements — using certified compliance software for both residential and non-residential projects across California.

What if I already have drawings but need code compliance checked?

We offer standalone code compliance checking as an on-demand service — reviewing your existing electrical drawings against NEC, ASHRAE 90.1, IECC, NFPA 72 or any other applicable electrical code and providing a written compliance report with specific marked corrections needed for permit approval. This is especially valuable before a resubmittal after a plan-check comment letter from the building department.

Does SYMATEQ provide PE seal and sign?

Yes. We facilitate professional engineer (PE) seal and sign for complete electrical sets, supporting the fast-paced nature of North American development. Every sealed set passes our full QA/QC audit before it leaves our team — ensuring the sealed drawings are code-compliant, accurate and permit-ready.

Need it sealed, converted or checked?

Bring SYMATEQ in for on-demand support exactly when you need it.

Partner With Us