Robust on-demand services to support the fast-paced nature of North American development — from PE seal & sign to rapid conversions and code compliance.
We conduct rigorous compliance checks against major codes and generate specialized energy documentation, so your final deliverables are flawless, compliant, and ready for permit review.
Yes. This is our core business — we are a specialized electrical engineering firm that prepares electrical power, lighting and low-voltage drawings for architects, PE firms, general contractors and developers across the US and Canada. You bring the project, we produce permit-ready construction documents engineered to NEC, IECC and the locally adopted code for your jurisdiction.
Our time-zone advantage means a typical electrical plan set or load calculation is delivered in 24–48 hours from receiving the base architectural drawings. Larger or more complex projects receive a milestone schedule aligned to your submittal deadline. We commit to that schedule and deliver on time, every time.
To start, we need: (1) the base architectural drawings (PDF, CAD or Revit), (2) the project address so we can determine the applicable code jurisdiction and edition, and (3) a brief project description covering building type, occupancy and the electrical scope needed. We handle the rest — from load calculations and equipment selections to permit-ready drawings with a complete code compliance package.
Both. We engineer residential electrical drawings (custom homes, multi-family, townhouses) and commercial projects of all sizes — from single-tenant retail and medical offices to large mixed-use and industrial facilities. Residential electrical calculations follow NEC Article 220 for single-family and multi-family; commercial projects follow the commercial load calculation methods in NEC Article 220 and ASHRAE 90.1 lighting compliance.
COMcheck is the DOE's free software tool that verifies commercial building energy code compliance under the International Energy Conservation Code (IECC) or ASHRAE 90.1. Most commercial building permit submissions in the US require a COMcheck Lighting report to demonstrate the lighting design meets the energy code — interior and exterior lighting power, plus mandatory controls. We produce the complete COMcheck Lighting report as part of our standard electrical compliance package.
Yes — for the electrical scope. California Title 24 Part 6 is the California Energy Code and is more stringent than IECC in many respects. We produce the Title 24 lighting compliance documentation — indoor and outdoor lighting power allowances, mandatory controls, occupancy sensors and daylighting requirements — using certified compliance software for both residential and non-residential projects across California.
We offer standalone code compliance checking as an on-demand service — reviewing your existing electrical drawings against NEC, ASHRAE 90.1, IECC, NFPA 72 or any other applicable electrical code and providing a written compliance report with specific marked corrections needed for permit approval. This is especially valuable before a resubmittal after a plan-check comment letter from the building department.
Yes. We facilitate professional engineer (PE) seal and sign for complete electrical sets, supporting the fast-paced nature of North American development. Every sealed set passes our full QA/QC audit before it leaves our team — ensuring the sealed drawings are code-compliant, accurate and permit-ready.
Bring SYMATEQ in for on-demand support exactly when you need it.
Partner With UsShare your details and a SYMATEQ engineer will follow up within one business day.
No spam. Unsubscribe any time.