Electrical, mechanical and plumbing, wherever your project is +1 407-751-1755WhatsAppTeams callLinkedIninfo@mep.symateq.com

COMcheck energy compliance reports

COMcheck lighting and mechanical energy code reports for US projects, prepared from your drawings and schedules for permit submission, for your licensed engineer to review and issue.

A calculator and handwritten notes on an engineer's desk

In shortSYMATEQ prepares COMcheck energy code compliance reports for US projects: lighting and mechanical scope, to the IECC or ASHRAE 90.1 edition your state or city has adopted, prepared from your drawings and schedules for permit submission. Drawings, models and calculations are prepared for review and issue by your licensed engineer.

What a COMcheck report covers

We prepare the report from your drawings and schedules. Your licensed engineer or contractor reviews it, issues it and submits it to the building department.

Lighting

  • Interior lighting power allowance and installed power
  • Exterior lighting power allowance and installed power
  • The lighting controls the code asks for, listed in the report
  • A luminaire schedule that matches the drawings

Mechanical

  • Equipment entered from your mechanical schedules
  • The requirements for the compliance path, listed in the report
  • Schedules that match the drawings

Compliance path

  • IECC or ASHRAE 90.1, in the edition your state or city has adopted
  • Title 24 Part 6 lighting documentation for California projects
  • The report and certificates for the plan reviewer

Coordination with your set

  • Lighting layouts and schedules in the same set
  • Plan notes the reviewer expects
  • Updates after plan review comments

IECC or ASHRAE 90.1?

COMcheck offers both. The one the building department accepts decides which we use.

What you need to knowIECCASHRAE 90.1
What it isThe International Energy Conservation Code, adopted by states and citiesASHRAE Standard 90.1, an energy standard that the IECC also accepts as a compliance path
Which edition appliesThe edition your state or city has adoptedThe edition your state or city has adopted or accepts

Either way, we confirm the adopted edition for your project address and deliver the COMcheck report for the plan reviewer.

Key terms, in plain words

COMcheck
Free software from the US Department of Energy that produces energy code compliance reports for commercial and multifamily buildings.
IECC
The International Energy Conservation Code. States and cities adopt a particular edition.
ASHRAE 90.1
An energy standard for buildings other than low-rise residential. The IECC accepts it as a compliance path.
Lighting power density
The watts of lighting per square foot. The energy code sets the most you may use for each kind of space.
Building department
The local office that reviews the permit set and decides whether to accept the report.

Which edition applies in your state?

The Engineering Hub lists the adopted energy code edition for every US state, so you can check before you send the job.

Open the Engineering Hub code lookup

What we need from you

The more complete the handover, the sooner the first report.

  • The project address, so we can confirm the adopted code edition
  • Floor plans and reflected ceiling plans
  • The lighting layout and a luminaire schedule (type, wattage and quantity)
  • The mechanical equipment schedule
  • The compliance path your jurisdiction accepts, if you know it

How a job runs

  1. Discovery and consultation

    A short conversation about the project, the deadline, the codes and what matters most to you. No obligation.

  2. Scope and onboarding

    You get a clear scope, timeline and price. We sign an NDA if you need one, set up secure file transfer and take on your Revit and CAD templates and layer standards.

  3. Engineering and modeling

    We do the design assist, calculations, drawings and Revit models, built to the codes of your region.

  4. Coordination and QA/QC

    We coordinate the trades in Navisworks and check the set against a QC list before it leaves us.

  5. Delivery and support

    You get clean, coordinated, permit-ready sheets on the agreed date, with quick turnaround on revisions.

The tools behind it

COMcheckEnergy-code compliance reports for the US
RevitModels, sheets and schedules, built in your template
AutoCADDrafting and detail work
BluebeamMarkups, review and submittals

Questions about COMcheck

What is a COMcheck report?

A COMcheck report is the energy code compliance report produced by COMcheck, the free software from the US Department of Energy, for commercial and multifamily buildings. It lists the lighting or mechanical data entered for the project and the code requirements the design must meet, and many plan reviewers ask for it with the permit set.

Do you prepare COMcheck reports?

Yes, for lighting and mechanical scope on US projects, where the energy code calls for them. We prepare them from your drawings and schedules, and your engineer reviews and issues them.

Which code do you use, the IECC or ASHRAE 90.1?

The one your state or city has adopted for the project. We confirm the adopted edition for the project address, using the Engineering Hub code lookup, and enter it in COMcheck. The IECC also accepts ASHRAE 90.1 as a compliance path, so the choice depends on what the building department accepts.

What do you need to prepare a COMcheck report?

The project address, the floor plans and reflected ceiling plans, the lighting layout with a luminaire schedule (type, wattage and quantity), the mechanical equipment schedule, and the compliance path your jurisdiction accepts if you know it.

Do you prepare Title 24 documentation for California?

Yes. California projects follow Title 24 Part 6 rather than the IECC, so for them we prepare the Title 24 lighting compliance documentation. See electrical design assist.

Who submits the report to the building department?

Your engineer or contractor. We prepare the report and the matching drawings, your licensed engineer reviews and issues them, and submission and approval stay with you.

Can you update the report after plan review comments?

Yes. We update the report and the drawings together after the reviewer's comments, so the two keep matching.

How long does a COMcheck report take?

A typical report takes a few days from receiving the drawings and schedules, and larger projects get a date from us before we start.

Reviewed by the SYMATEQ team. Last reviewed: 16 November 2026

Start a project

Have a project in mind?

Tell us the discipline, the code and the deadline. We reply with a price and a date, usually within one business day.

Used only to reply to you. Privacy