Engineering notes
Short pieces on MEP drafting and modeling, codes, calculations and coordination, written by the people doing the work.

In shortPractical notes for engineers, architects and contractors on MEP drafting and modeling, electrical, mechanical and plumbing calculations, lighting, coordination and BIM tools such as Revit and Autodesk Forma, across the US, Canada, Australia, New Zealand, the UK, Ireland, the Netherlands, Finland and the Middle East. Each note starts with the short answer, then shows the working.

Electrical Design · 4 min read
Outsourcing Electrical Design: A Buyer's Guide for AE Firms and Contractors
When outsourcing electrical design works, what to hand over, what to keep, and seven questions that separate an engineering partner from a drafting vendor.

Electrical Calculations · 3 min read
NEC 220.56 Worked Example: Sizing a Commercial Kitchen Feeder
How NEC 220.56 demand factors apply to commercial kitchen equipment, with a worked example at 208V three-phase and the two-largest-loads floor.

Electrical Design · 5 min read
Designing to the Canadian Electrical Code When Your Team Works to the NEC
CSA C22.1 is not a Canadian NEC. What actually differs, how provincial adoption works, and why converting a US set to a Canadian one is re-engineering.

Electrical BIM · 3 min read
Electrical Coordination Across Australia and New Zealand: One Standard, Two Rulebooks
AS/NZS 3000 applies in both countries; NCC Section J does not. What that means for electrical coordination, clash detection and lighting.

Electrical BIM · 4 min read
Where Electrical BIM Models Come From: Panels, Switchgear & LOD Explained
Where to start Revit content for electrical panels and switchgear, what LOD 200, 350 and 400 mean for electrical scope, and how to avoid clashes.

Revit · 3 min read
Revit MEP Modelling for UK Projects: What to Agree Before the First Model
What to settle with a modelling partner on a UK project: the BIM execution plan, ISO 19650 naming, Uniclass, levels of information, standards and handover.

Electrical Drafting · 2 min read
Electrical Drafting and Revit Modelling, Irish Projects
What to hand over for electrical drafting, Revit modelling and DIALux lighting models on Irish projects: templates, symbols, the brief and base drawings.

Revit · 2 min read
Revit MEP Modeling for Finnish Projects: COBIM, IFC and SFS 6000
What to agree with a modeling partner on a Finnish project: the COBIM requirements, IFC exchange, SFS 6000 for electrical design, language and templates.

Lighting · 2 min read
Lighting Models for Gulf Projects: What to Agree and Hand Over
What a DIALux or AGi32 lighting model package for a Gulf project usually contains, and what to settle with the consultant before modelling starts.

EV Charging · 3 min read
EV Charging Load Management: Adding Chargers Without Upsizing the Service
How an energy management system lets several EV chargers share one service, what the load calculation has to show, and what the inspector will ask for.

Mechanical · 3 min read
HVAC Load Calculation for a Tenant Fit-Out: What the Mechanical Engineer Needs
The inputs a mechanical engineer needs for a tenant fit-out load calculation, a worked ventilation example, and how the result sets equipment sizes.

BIM · 4 min read
Autodesk Forma and MEP: What It Changes for Drafting and Modeling
What Autodesk Forma does, what it hands to Revit, and what MEP engineers, drafters and modelers should check when a model arrives from Forma.

Netherlands · 3 min read
Revit MEP Modelling for Dutch Projects: NEN 1010, BENG and the ILS
What to agree with a modelling partner on a Dutch project: NEN 1010 and the Bbl, the ILS and NL-SfB, IFC exports, E and W installaties, the working day.

Drafting · 3 min read
MEP Drafting vs MEP Modeling: Which Do You Need?
MEP drafting produces the drawings. MEP modeling builds the coordinated 3D Revit model they come from. How to choose for a fit-out, new build or retrofit.

Plumbing · 3 min read
What a Plumbing Permit Set Contains: Fixtures, Sizing, Risers and Gas
What a plumbing permit set for a commercial fit-out normally contains: plans, fixture count, pipe sizing, risers and schedules, and what we need.

Electrical Design · 3 min read
SD, DD & CD in Construction: What Each Phase Means and What's Due
What electrical deliverables should look like at Schematic Design, Design Development and Construction Documents, and what the wrong level of detail costs.